Contract summary
This project will demolish the approximately 1.4-mile-long SR 99 Alaskan Way Viaduct (AWV) structure from the vicinity of South Dearborn Street to the south portal of the Battery Street Tunnel. This structure passes through the city of Seattle, adjacent to the waterfront. The AWV was completed in 1953, and is a double deck, predominantly reinforced concrete structure. The project will include the following:
Demolition of the approximately 1.4-mile-long AWV structure, including all associated ramps. The AWV Bridges 99/540 NB and 99/540 SB consist of three span frames that support two roadway decks. The frames generally span over parking areas and city streets, and in some locations, are in close proximity to occupied buildings. The concrete reinforced frames are fixed, monolithic (moment resisting) structures.
Demolition of one on-ramp located at Columbia Street and one off-ramp located at Seneca Street. Ramp roadways are typically supported by prestressed concrete girders. Demolition of columns and footings to a depth of 5 ft. below finished grade. Demolition of approximately 210 ft. of two steel girder structures spanning the Burlington Northern Santa Fe Railroad tracks.
Other work elements include, but are not limited to, grading, paving, sidewalk, storm drainage, water quality, traffic signals, maintenance of traffic, signing, pavement marking, illumination, landscaping, and protection of public and private property and infrastructure. In addition, the project will decommission the Battery Street Tunnel, re-grade Aurora Avenue between Harrison Street and Denny Way, and connect the surface streets at John Street and Thomas Street.
- Award status: Awarded 6/23/2016
- Awarded to: Kiewit Infrastructure West Co.
33455 6th Ave S
Federal Way, WA 98003-6335 - Award amount: $93,749,999.00
Submitted SOQ's and proposals
- Submitted SOQs and Proposals (FTP Directory) - Posted 4/30/2021
Price proposal opening results
- Apparent Best Value Calculation (PDF 65.5KB) - Posted 5/16/2018
- Bid Tabulation (PDF 27KB) - Posted 5/17/2018
Conformed RFP
- Instructions to Proposers (PDF 429KB) - Posted 4/19/2018
- Chapter 1 (PDF 743KB) - Posted 4/19/2018
- Chapter 2 (FTP Directory) - Posted 4/19/2018
- Appendices (FTP Directory) - Posted 4/25/2018
RFP question & answer
- General Responses 3 (PDF 78.2KB) - Posted 3/23/2018
- General Responses 2 (PDF 63.1 KB) - Posted 3/20/2018
- Electrical Responses 2 (PDF 63.1KB) - Posted 3/20/2018
- CCTV at Elliot SB onramp (PDF 69.8KB) - Posted 3/20/2018
- General Responses (PDF 69.8KB) - Posted 3/1/2018
- Electrical Responses (PDF 67.9KB) - Posted 3/1/2018
- Attachment to Q&A (PDF1895KB) - Posted 3/1/2018
RFP addenda
- Addendum #1 (FTP Directory) - Posted 1/26/2018
- Addendum #2 (FTP Directory) - Posted 2/2/2018
- Addendum #3 (FTP Directory) - Posted 2/9/2018
- Addendum #4 (FTP Directory) - Posted 2/16/2018
- Addendum #5 (FTP Directory) - Posted 2/23/2018
- Addendum #6 (FTP Directory) - Posted 3/5/2018
- Addendum #7 (FTP Directory) - Posted 3/9/2018
- Addendum #8 (FTP Directory) - Posted 3/19/2018
- Addendum #9 (FTP Directory) - Posted 3/23/2018
- Addendum #10 (FTP Directory) - Posted 3/30/2018
- Addendum #11 (FTP Directory - Posted 4/6/2018
- Addendum #12 (FTP Directory) - Posted 4/11/2018
Request for proposals
- Instructions to Proposers (PDF 411KB)- Posted 1/8/2018
- Chapter 1 (PDF1104KB) - Posted 1/8/2018
- Chapter 2 (FTP Directory) - Posted 1/9/2018
- Appendices (FTP Directory) - Posted 1/8/2018
Shortlisted proposers
- Shortlisted Proposers (PDF 132KB) - Posted 10/16/2017
Submitters list
- Submitters List with Point of Contract (PDF 76.8KB) - Posted 9/8/2017
RFQ question & answer
- Q & A #1 (PDF 30KB) - Posted 8/11/2017
- Q & A #2 (PDF105 KB) - Posted 8/18/2017
- Q & A #3 (PDF 115 KB) - Posted 8/24/2017
RFQ addenda
- Addendum #1 (PDF 17.2KB) - Posted 8/3/2017
- Addendum #2 (PDF 12.0 KB) - Posted 8/9/2017
- Addendum #3 (PDF 35.4 KB) - Posted 8/11/2017
- Addendum #4 (PDF 131 KB) - Posted 8/18/2017
- Addendum #5 (PDF 122 KB) - Posted 8/24/2017
- Addendum #6 (PDF 119 KB) - Posted 8/25/2017
Voluntary submitter's meeting
- Meeting Presentation (PDF 2.9 MB) - Posted 8/3/2017
- North Portal Interim Configuration (PDF 478 KB) - Posted 8/3/2017
- North Portal Final Configuration (PDF 431KB) - Posted 8/3/2017
- Battery Street Tunnel Street Cross Sections (PDF 1112KB) - Posted 8/3/2017
- Battery Street Tunnel Work Zone (PDF 553 KB) - Posted 8/3/2017
- Viaduct North Work Zone (PDF 83.0 MB) - Posted 8/3/2017
- Viaduct South Work Zone (PDF 62 MB) - Posted 8/3/2017
- Meeting Attendees (PDF 215 KB) - Posted 8/3/2017
Request for qualifications
- Request for Qualifications (PDF 209KB) - Posted 7/25/2017
As-Built Information
- As-Built Information (FTP Directory) - Posted 7/25/2017
Project information available
- Advertisement Notice (PDF 139KB) - Posted 7/3/2017 (Revised 7/19/2017)
- Fact Sheet (PDF 1239KB) - Posted 7/25/2017
- Alaskan Way Traffic Switch Scope of Work (PDF 107KB) - Posted 8/30/2017
- RFQ Alaskan Way Traffic Switch Concept Plans (PDF 30194KB) - Posted 8/30/2017