Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractor's bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

6/11/2025 bid opening - Olympia, WA

Item no. 1: I-90, Guardrail Basic Safety - Rehabilitation

Contract number: XE3643
Engineer's estimate: $966,163.50
Number of addenda: 0
Number of bidders: 4/3
Award status: pending

Preliminary bid total results

Apparent low: Massana Construction, Inc. - $943,364.13
Apparent second: Coral Construction Company - $1,095,959.60
Apparent third: Frank Gurney, Inc. - $1,182,432.20

Verified bid total results

Low bidder: Massana Construction, Inc.
Bid amount: $943,364.13

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $170,512.00
    Description of work: guardrail construction of all types (partial) - remove guardrail, remove guardrail anchor, beam guardrail block, beam guardrail type 1, beam guardrail type 31, beam guardrail transition section type 21, beam guardrail type 31 non-flared terminal, beam guardrail post

DBE goal: $169,805.54
DBE total: $170,512.00

Second bidder: Coral Construction Company
Bid amount: $1,095,959.60

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC - sub - $197,273.00
    Description of work: flagging (i.e. traffic control) services

DBE goal: $197,272.73
DBE total: $197,273.00

Third bidder: Frank Gurney, Inc.
Bid amount: $1,182,432.20

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $214,000.00
    Description of work: flagging/traffic control

DBE goal: $212,837.80
DBE total: $214,000.00
 

6/4/2025 bid opening - Olympia, WA

Item no. 1: 1st Ave Roundabout

Contract number: XE3601
Engineer's estimate: $2,292,801.37
Number of addenda: 3
Number of bidders: 10/5
Award status: pending

Preliminary bid total results

Apparent low: Cameron-Reilly LLC - $1,870,547.28
Apparent second: Tapani, Inc. - $1,978,510.00
Apparent third: Hurst Construction, LLC - $2,098,172.28

Verified bid total results

Low bidder: Cameron_Reilly LLC
Bid amount: $1,870,547.28

Subcontractor named

  1. MCC Electric LLC
    Description of work: electrical
  2. Cameron Reilly
    Description of work: rebar installation

Disadvantaged Business Enterprise (DBE)

  1. North Star Enterprises 1, Inc - sub - $175,000.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, misc. Removal & installations (i.e., temp, plastic & paint stripes, monuments) guide posts, silt fence, high visibility fence, sign erection, sweeping, crack sealing, joint sealing, bridge
  2. M2 Industrial Inc. - sub - $70,000.00
    Description of work: guardrail construction of all types. Flexible guide posts & sign erection install on highways, roads, & streets, & bridges. Install of temp & permanent traffic control: impact attenuators, concrete barriers & delineators, & glare screens. Bridge rail & retrofit. Erosion control: silt, high visibility, & cable fence
  3. O'Bunco Engineering Inc - sub - $30,000.00
    Description of work: land surveying: GPS control, boundary and construction, layout/staking

DBE goal: $243,171.15
DBE total: $275,000.00

Second bidder: Tapani, Inc.
Bid amount: $1,978,510.00

Subcontractor named

  1. MCC Electric LLC
    Description of work: electrical
  2. Siverline Plumbing and HVAC
    Description of work: HVAC
  3. Siverline Plumbing and HVAC
    Description of work: plumbing
  4. Tapani Inc
    Description of work: structural steel
  5. Tapani Inc
    Description of work: rebar

Disadvantaged Business Enterprise (DBE)

  1. Total Site Services, LLC - sub - $387,682.00
    Description of work: site concrete, curbs and gutters, concrete paving

DBE goal: $257, 206.30
DBE total: $387,682.00

Third bidder: Hurst Construction LLC
Bid amount: $2,098,172.28

Subcontractor named

  1. MMC Electrical
    Description of work: electrical work
  2. Climatek
    Description of work: HVAC
  3. Total Site Services
    Description of work: structural steel rebar
  4. Hurst Construction
    Description of work: plumbing

Disadvantaged Business Enterprise (DBE)

  1. Total Site Services - sub - $282,912.00
    Description of work: concrete work, dowel bars

DBE goal: $272,762.40
DBE total: $282,912.00

Item no. 2: I-82 to Selah Creek Paving

Contract number: XE3638
Engineer's estimate: $2,444,214.00
Number of addenda: 1
Number of bidders: 3/3
Award status: pending

Preliminary bid total results

Apparent low: Granite Construction Company - $1,544,543.50
Apparent second: Central Washington Asphalt - $1,848,000.00
Apparent third: Interstate Concrete & Asphalt Company - $1,867,385.10

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $1,544,543.50

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged Business Enterprise (DBE)

  1. North Star Enterprises 1, Inc - sub - $38,720.00
    Description of work: guideposts, crack sealing
  2. M2 Industrial Inc - sub - $38,525.00
    Description of work: guardrail construction of all types
  3. TBMM, LLC - sub - $176,158.00
    Description of work: sign erection; flagging (i.e., traffic control) services

DBE goal: $231,681.53
DBE total: $253,403.00

Second bidder: Central Washington Asphalt, Inc.
Bid amount: 1,848,000.00

Subcontractor named

  1. Shamrock Traffic, Inc.
    Description of work: rebar

Disadvantaged Business Enterprise (DBE)

  1. Traffic Management, Inc. - sub - $279,072.00
    Description of work: sign erection, highway, road, street, or bridge, flagging (i.e., traffic control) services

DBE goal: $277,200.00
DBE total: $279,072.00

Third bidder: Interstate Concrete & Asphalt Company
Bid amount: $1,867,385.10

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged Business Enterprise (DBE)

  1. Traffic Management Inc - sub - $335,245.75
    Description of work: traffic control, class A signs, temporary pavement markings, portable changeable message sign

DBE goal: $280,107.77
DBE total: $335,245.75

Item no. 3: Bainbridge Ferry Terminal NE Parking Lot Pavement Rehabilitation

Contract number: XE3637
Engineer's estimate: $808,562.00
Number of addenda: 1
Number of bidders: 6/3
Award status: pending

Preliminary bid total results

Apparent low: Puget Paving and Construction, Inc. - $793,594.00
Apparent second: NW Cascade Inc - $811,811.00
Apparent third: Granite Construction Company - $856,093.57

Verified bid total results

Low bidder: Puget Paving and Construction, Inc.
Bid amount: $793,594.00

Public works small business enterprise (PWSBE)

  1. American Electrical Service - sub - $39,679.70
    Description of work: electrical (partial)

PWSBE goal: $39,679.70
PWSBE total: $39,679.70

Veteran-owned business (VOB)

  1. Allegiance Trucking LLC dba Marwood General Construction - sub - $15,871.88
    Description of work: trucking

VOB goal: $15,871.88
VOB total: $15,871.88

Second bidder: Northwest Cascade, Inc.
Bid amount: $811,811.00

Public works small business enterprise (PWSBE)

  1. Newell Brothers - sub - $40,600.00
    Description of work: trucking

PWSBE goal: $40,590.55
PWSBE total: $40,600.00

Veteran-owned business (VOB)

  1. HCON Inc - sub - $16,500.00
    Description of work: trucking

VOB goal: $16,236.22
VOB total: $16,500.00

Third bidder: Granite Construction Company
Bid amount: $856,093.57

Public works small business enterprise (PWSBE)

  1. American Electrical Service - sub - $50,000.00
    Description of work: electrical (partial) - conduit

PWSBE goal: $42,805.68
PWSBE total: $50,000.00

Veteran-owned business (VOB)

  1. American Electrical Service - sub - $43,050.94
    Description of work: electrical (partial) - trenching

VOB goal: $17,121.87
VOB total: $43,050.94

Item no. 4: Gravelly-Thorne Connector Shared Use Path

Contract number: XE3611
Engineer's estimate: $25,576,223.00
Number of addenda: 6
Number of bidders: 9/6
Award status: pending

Preliminary bid total results

Apparent low: Ceccanti, Inc. - $23,364,069.40
Apparent second: Johansen Construction Company, LLC - $25,190,000.00
Apparent third: Max J. Kuney Company - $25,898,710.13

Verified bid total results

Low bidder: Ceccanti, Inc.
Bid amount: $23,364,069.40

Subcontractor named

  1. Reign City Services
    Description of work: electrical
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation
  3. Ceccanti, Inc
    Description of work: structural steen installation

Public works small business enterprise (PWSBE)

  1. Reign City - sub - $864,551.91
    Description of work: electrical
  2. PNW Reinforcing, Inc - sub - $1,016.040.00
    Description of work: rebar installation

PWSBE goal: $1,168,203.47
PWSBE total: $1,880,591.91

Veteran-owned business (VOB)

  1. M2 Industrial, Inc - sub - $762,721.00
    Description of work: fence install, guardrail

VOB goal: $700,922.08
VOB total: $762,721.00

Second bidder: Johansen Construction Company
Bid amount: $25,190,000.00

Subcontractor named

  1. Condon Johnson & Associates, Inc.
    Description of work: structural steel
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation
  3. Reign City Services, LLC.
    Description of work: electrical

Public works small business enterprise (PWSBE)

  1. PNW Reinforcing, Inc. - sub - $950,000.00
    Description of work: rebar
  2. Reign City Services, LLC. - sub - $350,000.00
    Description of work: electrical

PWSBE goal: $1,259,500.00
PWSBE total: $1,300,000.00

Veteran-owned business (VOB)

  1. M2 Industrial, Inc - sub - $800,000.00
    Description of work: bridge railing, fencing

VOB goal: $755,700.00
VOB total: $800,000.00

Third bidder: Max J. Kuney Company
Bid amount: $25,898,710.14**

Subcontractor named

  1. Reign City Services, LLC.
    Description of work: electrical
  2. PNW Reinforcing, Inc.
    Description of work: rebar installation

Public works small business enterprise (PWSBE)

  1. O'Bunco Engineering Inc - sub - $135,000.00
    Description of work: surveying
  2. MBI Construction Services - sub - $250,000.00
    Description of work: metal fabrication & installation
  3. The Bag Lady, Inc. - sub - $150,000.00
    Description of work: erosion control
  4. Reign City Services, LLC. - sub - $830,000.00
    Description of work: electrical

PWSBE goal: $1,294,935.51 
PWSBE total:  $1,365,000.00 

Veteran-owned business (VOB)

  1. M2 Industrial, Inc - sub - $800,000.00
    Description of work: fencing, railing

VOB goal:  $776,961.30
VOB total: $800,000.00

Item no. 5: BNRR Bridge to Geiger Rd Paving

Contract number: XE3640
Engineer's estimate: $5,868,893.50
Number of addenda: 2
Number of bidders: 4/2
Award status: pending

Preliminary bid total results

Apparent low: Shamrock Paving, Inc. - $4,920,000.00
Apparent second: CPM Development Corporation - $4,995,995.00

Verified bid total results

Low bidder: Shamrock Paving, Inc.
Bid amount: $4,920,000.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged Business Enterprise (DBE)

  1. KB Markings - sub - $73,301.00
    Description of work: painting lines on highways, streets and bridges, sign erection
  2. North Star Enterprises 1, Inc. dba North Star Enterprises, Inc. - sub - $665,926.80
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, misc. removal & installations, guideposts, sign erection, sweeping, crack sealing, joint sealing
  3. M2 Industrial Inc. - sub - $77,591.50
    Description of work: guardrail construction of all types
  4. D&B Landworks and Development, LLC - sub - $148,000.00
    Description of work: dump trucking
  5. O'Bunco Engineering Intl Inc. dba O'Bunco Engineering Inc - sub - $19,405.00
    Description of work: land surveying, layout/staking

DBE goal: $984,000.00
DBE total: $984.224.30

Second bidder: CPM Development Corporation
Bid amount: $4,995,995.00

Subcontractor named

  1. Five Star Concrete Inc.
    Description of work: rebar installation

Disadvantaged Business Enterprise (DBE)

  1. North Star Enterprises 1, Inc. dba North Star Enterprises, Inc. - sub - $765,094.00
    Description of work: flagging, traffic control, temp pavement marking & striping, rumble strips, removal & installations, guideposts, sweeping, crack sealing, joint sealing
  2. O'Bunco Engineering Intl Inc. dba O'Bunco Engineering Inc - sub - $19,405.00
    Description of work: land surveying, layout/staking
  3. Eller Corporation - sub - $42,009.75
    Description of work: site work, excavation, pipeline, underground utility
  4. M2 Industrial Inc. - sub - $70,091.50
    Description of work: guardrail construction of all types, concrete barriers
  5. KB Markings - sub - $63,383.00
    Description of work: painting lines on highways, sign erection
  6. A.M.C. Trucking LLC - sub - $41,420.00
    Description of work: dump trucking

DBE goal: $999,199.00
DBE total: $1,001,403.25

 

 

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.