Bid opening results
Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.
Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.
If a change has been made to a contractor's bid amount or bid position after review, it will be marked with two asterisks.**
- Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
- Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.
8/13/2025 bid opening - Olympia, WA
Item no. 1: Eagle Harbor Maintenance Facility Welding Shop Building Replacement
Contract number: XE3625
Engineer's estimate: $7,400,805.60
Number of addenda: 7
Number of bidders: 2/2
Award status: pending
Preliminary bid total results
Apparent low: TRICO Companies, LLC - $12,522,640.17
Apparent second: Schuchart Corporation - $15,736,705.69**
Verified bid total results
Low bidder: TRICO Companies, LLC
Bid amount: $12,522,640.17
Subcontractor named
- Industry Erectors, Inc (INDUSEI849K5)
Description of work: structural steel installation - Pacific Steel Group LLC (PACIFSG767BR)
Description of work: rebar installation - Holmberg Company (HOLMBC*066ME)
Description of work: heating, venitilation and air conditioning - Holmberg Company (HOLMBC*794MF)
Description of work: plumbing - Dalton Electric Co (DALTOEC077KL)
Description of work: electrical
Public works small business enterprise (PWSBE)
- Hot Mix Pavers Inc. - sub - $104,040.00
Description of work: asphalt - Seattle Commercial Signs - sub - $10,607.00
Description of work: signage
PWSBE goal: $626,132.01
PWSBE total: $114,647.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.
Veteran-owned business (VOB)
- None proposed
Description of work: none proposed
VOB goal: $375,679.21
VOB total: $0.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.
Second bidder: Schuchart Corporation
Bid amount: $15,736,705.69**
Subcontractor named
- Dalton Electric (DALTOEC810PM)
Description of work: electrical - CAS (WA CC: COLUMAS826CK)
Description of work: HVAC (WA PC: COLUMAS783D5) - Bratonia (BRATOML89QA
Description of work: plumbing - KWH (KWHCOC1855OA) / Precision (PREC1S1791NQ)
Description of work: structural steel erect / structural steel fab - Bayshore
Description of work: rebar (BAYSHCL82ONF)
Public works small business enterprise (PWSBE)
- None proposed
Description of work: none proposed
PWSBE goal: $786,835.28
PWSBE total: $0.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.
Veteran-owned business (VOB)
- None proposed
Description of work: none proposed
VOB goal: $472,101.17
VOB total: $0.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.
Item no. 2: US 12, Rimrock Vicinity - Emergency Repair
Contract number: XE3652
Engineer's estimate: $1,250,404.50
Number of addenda: 5
Number of bidders: 5/5
Award status: awarded 8/14/2025
Preliminary bid total results
Apparent low: Scarsella Bros. Inc. - $1,045,045.45
Apparent second: Interwest Construction, Inc. - $1,107,750.00
Apparent third: Granite Construction Company - $1,398,871.00
Verified bid total results
Low bidder: Scarsella Bros. Inc.
Bid amount: $1,045,045.45
Subcontractor named
- None proposed
Description of work: none proposed
Public works small business enterprise (PWSBE)
- Northwest Striping and Sealing, LLC. dba Northwest Asphalt - sub - $48,240.50
Description of work: asphalt paving - Allegiance Trucking, LLC. dba Marwood General Construction - sub - $4,500.00
Description of work: dump trucking
PWSBE goal: $52,252.27
PWSBE total: $52,740.50
Veteran-owned business (VOB)
- Allegiance Trucking, LLC. dba Marwood General Construction - sub - $21,000.00
Description of work: dump trucking
VOB goal: $20,900.91
VOB total: $21,000.00
Second bidder: Interwest Construction, Inc.
Bid amount: $1,107,750.00
Subcontractor named
- None proposed
Description of work: none proposed
Public works small business enterprise (PWSBE)
- Northwest Striping & Sealing LLC dba Northwest Asphalt - sub - $53,650.00
Description of work: commercial HMA - Northwest Striping & Sealing LLC dba Northwest Asphalt - sub - $2,000.00
Description of work: mobilization (partial)
PWSBE goal: $55,387.50
PWSBE total: $55,650.00
Veteran-owned business (VOB)
- O-K Traffic Control Services - sub - $42,840.00
Description of work: construction signs Cl. A
VOB goal: $22,155.00
VOB total: $42,840.00
Third bidder: Granite Construction Company
Bid amount: $1,398,871.00
Subcontractor named
- None proposed
Description of work: none proposed
Public works small business enterprise (PWSBE)
- TBMM, LLC - sub - $9,000.00
Description of work: PCMS - TBMM, LLC - sub - $40,000.00
Description of work: project temporary traffic control - TBMM, LLC - sub - $34,848.00
Description of work: construction signs Class A
PWSBE goal: $69,943.55
PWSBE total: $83,848.00
Veteran-owned business (VOB)
- MS Industrial, Inc. - sub - $60,900.00
Description of work: beam guardrail Ty 31 8 ft post
VOB goal: $27,977.42
VOB total: $60,900.00
8/6/2025 bid opening - Olympia, WA
Item no. 1: ER Transportation Management Center Relocation
Contract number: MS9468
Engineer's estimate: $1,195,850.00
Funds available: $1,371,609.56
Number of addenda: 4
Number of bidders: 4/1
Award status: pending
Preliminary bid total results
Apparent low: Halme Builders, Inc. - Base $1,500,000.00
Verified bid total results
Low bidder: Halme Builders, Inc.
Bid amount: $1,500,000.00
Subcontractor named
- Ascent Mechanical & Plumbing
Description of work: plumbing - Norstar Heating & Cooling
Description of work: HVAC - Power City Electric
Description of work: electrical - Halme Builders, Inc.
Description of work: structural steel installation - Halme Builders, Inc.
Description of work: rebar installation
Public works small business enterprise (PWSBE)
- Pro Paints - sub - $77,500.00
Description of work: painting
PWSBE goal: $75,000.00
PWSBE total: $77,500.00
Veteran-owned business (VOB)
- Power City Electric - sub - $429,950.00
Description of work: electrical
VOB goal: $30,000.00
VOB total: $429,950.00
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.