Contract summary
The project will reconstruct US 12 as a Limited Access Full Control four lane divided highway to reduce crash risk and improve economic vitality.
- Award status: Awarded 4/13/2020
- Awarded to: Guy F. Atkinson Construction, LLC
707 South Grady Way Suite 500
Renton, WA 98057-3224 - Award amount: $113,995,875.00
Submitted SOQs and proposals
- Submitted SOQs and Proposal (FTP Directory) - Posted 3/3/2021
Price proposal opening results
- Apparent Best Value Determination (PDF 68KB) - Posted 2/26/2020
- Bid Tabulation (PDF 18KB) - Posted 2/26/2020
Conformed RFP
- Appendices (FTP Directory) - Posted 1/30/2020
- Chapter 1 (PDF 2574KB) - Posted 1/30/2020
- Chapter 2 (PDF 5446KB) - Posted 1/30/2020
- Instructions to Proposers (PDF 1315KB) - Posted 1/30/2020
RFP question & answer
- Q&A #1 (PDF 15KB) - Posted 10/11/2019
- Q&A #2 (PDF 93KB) - Posted 11/14/2019
RFP addenda
- Addendum #1 (FTP Directory) - Posted 9/5/2019
- Addendum #2 (FTP Directory) - Posted 9/6/2019
- Addendum #3 (FTP Directory) - Posted 9/12/2019
- Addendum #4 (FTP Directory) - Posted 9/27/2019
- Addendum #5 (FTP Directory) - Posted 10/18/2019
- Addendum #6 (FTP Directory) - Posted 10/29/2019
- Addendum #7 (FTP Directory) - Posted 11/6/2019
- Addendum #8 (PDF 70KB) - Posted 11/22/2019
- Addendum #9 (FTP Directory) - Posted 11/22/2019
- Addendum #10 (FTP Directory) - Posted 12/18/2019
- Addendum #11 (FTP Directory) - Posted 12/18/2019
- Addendum #12 (FTP Directory) - Posted 1/22/2020
Voluntary proposers meeting
- Sign in Sheets (PDF 2608MB) - Posted 8/22/2019
- Presentation (PDF 5458KB) - Posted 8/22/2019
Request for proposal
- Instructions to Proposers (PDF 508KB) - Posted 8/19/2019
- Chapter 1 (PDF 1.9MB0 - Posted 8/19/2019
- Appendices (FTP Directory) - Posted 8/19/2019
- Contract Form (DOCX 45KB) - Posted 8/19/2019
Shortlisted submitters
- Shortlist Letter (PDF 32KB) - Posted 8/9/2019
Submitters list
- Submitters List with Single Point of Contact (PDF 81KB) - Posted 7/16/2019
RFQ question & answer
- RFQ Q&A #1 (PDF 79KB) - Posted 6/13/2019
RFQ addenda
- Addendum #1 (FTP Directory) - Posted 6/7/2019
Voluntary submitters meeting
- Presentation (PDF 1.8MB) - Posted 6/7/2019
- Sign In Sheet (PDF 1.1MB) - Posted 6/7/2019
Request for qualifications
- Conformed Request for Qualifications (PDF 520KB) - Posted 7/15/2019
- Request for Qualifications (PDF 520kb) - Posted 5/23/2019
- Executive Order 1059 (PDF 66KB) - Posted 5/23/2019
- Fillable Form A (DOCX 17KB) - Posted 5/23/2019
- Fillable Form B1 (DOCX 37KB) - Posted 5/23/2019
- Fillable Form B2 (DOCX 18KB) - Posted 5/23/2019
- Fillable Form c (DOCX 20KB) - Updated 6/7/2019
- Fillable Form D (DOCX 17KB) - Posted 5/23/2019
Project information available
- Advertisement Notice (PDF 196KB) - Posted 5/23/2019
These materials are provided for informational purposes only – WSDOT makes no representations or warranties concerning the information provided herein. The contents of this document are not to be relied upon as contractually binding upon WSDOT, and are being provided solely as a courtesy to potential bidders.
- Environmental Assessment (FTP Directory) - Posted 6/3/2019
- Contractor Fact Sheet (PDF 1.5MB) - Updated 5/6/2019
- US 12 Lowden Vicinity Right of Way Plans (PDF 26.1MB) - Posted 3/20/2019
- US 12 Touchet Vicinity Right of Way Plans (PDF 24.2 MB) - Posted 3/20/2019
- Existing InRoads Digital Terrain Model (DTM 62.5MB) - Posted 3/20/2019
The above Digital Terrain Model is in Project Datum [NAD83(2011), NAVD88]. To convert to Washington State Plane South Zone, use the following Combined Factor 0.999927516. The Project Datum can be calculated using the following formula: PD = (SPC / CF + 100,000) * (39.37/12)