Contract summary
Requires planing bituminous pavement, hot mix asphalt (HMA) paving, pavement repair, installing concrete curb, guardrail, guide posts and blocks, crack sealing, HMA joint sealing, shoulder finishing, pavement markings, centerline rumble strips, signing and traffic control and other work. 25 working days. Involves 47 items. Work class 4.