Project overview
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and installing rumble strips, the roadway surface will have a smoother ride that will be preserved for years to come.
What to expect
Daytime work will take place between 6 a.m. and 8 p.m., Monday through Friday. During this time, drivers can expect single lane closures in either direction of US 395 throughout the duration of the project.
The Hatch Road interchange was repaved prior to winter suspension in the fall of 2024.
A speed reduction of 45 mph will be in place throughout the work zone until project completion.