Planning study news
The Complete Streets pre-design study for State Route 141- Bingen to White Salmon
Purpose
Virtual open house
Our virtual open house is open April 22 through May 13
Online open house and survey available in English and Spanish
Past events:
We hosted our first open house for the project on July 25, 2024, and our second open house on April 22, 2025. We have also coordinated multiple agency partner meetings and alternative selection workshops.
Following the completion of the Complete Streets pre-design study, paving work along SR 141 between SR 14/SR 141 intersection in Bingen and SR 141 at milepost 1.77 in White Salmon will begin. The pre-design study will include a Complete Streets analysis to identify improvements for pedestrians, bicyclists and for those who use mobility devices to travel through the area.
Complete Streets is an approach to planning, designing, building, operating and maintaining the transportation system to allow for safe and convenient access to destinations for all users, including pedestrians, bicyclists, mobility device users and transit riders.