• Study

SR 702 8th Avenue South Roundabout Pre-Design Study

Planning study news

The SR 702 pre-design study is now complete. Thank you for participating in the online open house that was held August 24 to September 7.

Timeline
June - August 2021
Status
Complete

Purpose

WSDOT is replacing the existing two-way stop at the intersection of State Route 702 and 8th Avenue South with a modern roundabout. The intersection currently has stop control on the northbound and southbound legs, and a span wire mounted, four-head flashing beacon. This project will remove the stop signs and beacon system and provide new intersection control with a roundabout that fits within the intersection footprint.

Study map of SR 702 and 8th Avenue South in Pierce County

The existing two-way stop intersection of State Route 702 and 8th Avenue South is being replaced with a modern roundabout.

Studies show that roundabouts are safer than traditional traffic signals or stop sign controlled intersections. They accommodate vehicles of various sizes, including emergency vehicles, buses, bicycles, semi-trucks with trailers, and farm and logging equipment. 

This roundabout is being funded through the Highway Safety Improvement Program, a federal program that provides funding for needed safety improvement projects.