Project

SR 202/Mud Creek to Snoqualmie River - Fish Passage Project

Timeline: Construction begins in 2027 and runs through 2028.
  • Road
  • Pre-construction
  • King County
This project will remove the fish barrier on State Route 202 just east of Fall City at Mud Creek. The project will also improve the safety and reliability of SR 202 by addressing the need for frequent emergency maintenance and channel dredging at the crossing due to sedimentation and flooding of…
Project

SR 202/Sammamish Creek fish passage

Timeline: July 2024 - Fall 2024
  • Road
  • Construction
  • King County
In July 2024, WSDOT began replacing two culverts near the intersection of State Route 202 and Northeast 124th Street between Redmond and Woodinville with a single culvert. Two creeks in the area — an unnamed tributary of the Sammamish Creek and High School Creek — will be realigned to merge with…
Project

SR 203/Slough Bridge Vic to Kelly Rd NE Vic-Stormwater Retrofit

Timeline: Spring 2025 – Spring 2026
  • Road
  • Pre-construction
  • King County
This project will install vegetative filter strips on the side of State Route 203 just north of Fall City (milepost .69) and at Northeast 77th Street (milepost 7.69). The vegetative filter strips will treat stormwater running off the roadway to help protect nearby wetlands and sensitive areas.
Project

SR 509 Completion Project

Timeline: 2015-2029
  • Road
  • Construction
  • King County
The SR 509 Completion Project in King County is part of the Puget Sound Gateway Program, which also includes the SR 167 Completion Project in Pierce County. Together, these projects complete two of the Puget Sound region’s most critical freight corridors and improve access to I-5, the ports of…
Project

SR 509/Miller Creek fish passage

Timeline: 2026-2029
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals.

A culvert below State Route 509 west…
Project

SR 513 - Montlake Bridge - Mechanical Rehab, Deck Replacement & Joint Repair - Complete May 2022

Timeline: Summer 2021 - Spring 2022
  • Road
  • Completed
  • King County
In 2021, contractor crews working for WSDOT replaced the more than 20-year-old worn grid deck on the Montlake Bridge. They also made expansion joint and mechanical repairs so the movable span can continue to operate reliably and meet the growing multimodal traffic demands of northeast Seattle. In…
Project

SR 516/Barnes Creek fish passage - Complete Fall 2024

Timeline: 2021-2024
  • Road
  • Completed
  • King County
Prior to construction, which ended in October 2023, a failing clay culvert just 2 feet in diameter carried Barnes Creek under SR 516 near Des Moines. This narrow culvert was a barrier for fish trying to swim upstream. This project replaced that small clay culvert with a new cement box culvert 20…
Project

SR 518/24th Avenue S Bridge - Girder Replacement - Complete November 2023

Timeline: Summer to Fall 2023
  • Road
  • Completed
  • King County
During summer 2023, our contractor crews replaced the damaged girder on the 24th Avenue South bridge over SR 518 near the Sea-Tac International Airport. Crews also made bridge drain and drainpipe improvements in the area.
Project

SR 520 - Floating Bridge and Approaches Bridge Decks and Soffit Sealer - Complete Fall 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Crews working for WSDOT applied spray sealant to the bridge deck and soffits near expansion joints in both directions of the State Route 520 Evergreen Point floating bridge. The sealant will protect the bridge from corrosion, prolong its service life and help keep the bridge in a state of good…
Project

SR 520 148th Ave NE interchange - Overlake Access Ramp - Complete December 2023

Timeline: Summer 2021-Fall 2023
  • Road
  • Completed
  • King County
With this Connecting Washington project, we made multiple improvements to the State Route 520/148th Avenue Northeast interchange within the cities of Bellevue and Redmond.

Our contractor, Granite Construction, built a direct-access off-ramp from eastbound SR 520 to the Overlake…
Project

SR 520 Eastside Transit and HOV Project - Complete Summer 2015

Timeline: Construction began 2011; completed in 2015
  • Road
  • Completed
  • King County
This project added bus/carpool lanes in both directions between 108th Avenue Northeast in Bellevue and Lake Washington’s eastern shore. The project also built three landscaped, community-connecting highway lids over the highway, two transit stations in the highway median and the first leg of a…
Project

SR 520 Floating Bridge and Landings Project - Complete Summer 2017

Timeline: Bridge construction began in spring 2012 and was completed in summer 2017.
  • Road
  • Completed
  • King County
We replaced the world's longest floating bridge – a four-lane, 1960s-era structure – with a safer, six-lane bridge designed to withstand stronger windstorms and waves. Opened in April 2016, the new bridge also added shoulders for disabled vehicles and a separated, 14-foot-wide path for…
Project

SR 520 I-5 Express Lanes Connection Project - Completed

Timeline: August 2021 - May 2025
  • Road
  • Completed
  • King County
The SR 520/I-5 Express Lanes Connection Project will create a dedicated reversible transit and carpool connection between SR 520 and the I-5 Express Lanes, along with a reversible transit/carpool ramp at the I-5/Mercer Street interchange.
Project

SR 520 Montlake Project

Timeline: Summer 2019 - 2025
  • Road
  • Completed
  • King County
This project is complete.

The Montlake Project will improve transportation for both motorized and nonmotorized travel along the corridor with a new SR 520 eastbound bridge over Union Bay. This project also builds a new, three-acre lid covering the highway in Montlake that will…
Project

SR 520 Pontoon Construction Project - Complete Spring 2015

Timeline: Construction of the casting basin and pontoons began in Aberdeen in 2011. Pontoon construction ended in spring 2015.
  • Road
  • Completed
  • King County
The SR 520 floating bridge is supported and stabilized by 77 concrete pontoons . The Pontoon Construction Project built a casting basin and 33 of the bridge’s pontoons in Aberdeen, Washington. We built 44 of the bridge’s smaller pontoons in Tacoma, Washington, as part of the Floating Bridge and…
Project

SR 520 Portage Bay Bridge and Roanoke Lid Project

Timeline: 2024-2031
  • Road
  • Construction
  • King County
The Portage Bay Bridge and Roanoke Lid Project will replace the aging Portage Bay Bridge with a seismically resilient structure that includes improved bus/carpool travel and an extension of the SR 520 Trail. This project also builds a landscaped lid between Seattle’s Roanoke Park and North Capitol…
Project

SR 520 West Approach Bridge North Project - Complete December 2017

Timeline: Construction began in September 2014 and finished in December 2017.
  • Road
  • Completed
  • King County
The West Approach Bridge North Project extended SR 520’s three westbound lanes, including a transit/HOV lane, from the new floating bridge to Seattle’s Montlake neighborhood. It also expanded the new SR 520 Trail across Lake Washington to Seattle.
Project

SR 520/124th Avenue NE Interchange Improvements Project

Timeline: This project is currently in the preliminary engineering stage.
  • Road
  • Pre-construction
  • King County
Currently, over half the trips from westbound SR 520 are traveling to the Bellevue vicinity. A new project will allow westbound drivers the option to access the downtown Bellevue vicinity by exiting SR 520 onto 124th Avenue Northeast before reaching the heavily congested I-405/SR 520 interchange.…
Project

SR 522/Cat Whisker Creek Fish Passage

Timeline: Spring 2026 - Summer 2027
  • Road
  • Pre-construction
  • King County
This project will remove a fish passage barrier along Cat Whisker Creek at State Route 522, just east of 61st Avenue Northeast in Kenmore. Contractor crews working for WSDOT will remove an existing 6-foot by 3-foot box culvert and replace it with a fish-passable structure. This new structure has…
Project

SR 522/Thornton Creek Fish Passage

Timeline: Winter 2021-Spring 2028
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where roads act as barriers is a priority for the state. In western Washington, this means building hundreds of fish-passable structures under state highways to create habitat that is essential for meeting fish recovery goals.

A culvert below State Route 522…
Project

SR 525 Mukilteo Bridge Over Railroad – Bridge Replacement

Timeline: 2024 - 2028
  • Road
  • Pre-construction
  • King County
This project will replace the State Route 525 bridge overcrossing the BNSF railroad in the city of Mukilteo. The new bridge will include active transportation improvements to improve safety for all travelers and increase connectivity between Old Town Mukilteo and the waterfront, including the new…
Project

SR 900 - Tibbetts Creek to Lake Sammamish – fish passage

Timeline: 2020-2029
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals. Beginning as early as winter 2024, WSDOT will install…
Project

SR 900/57th Ave S to S 135th Pedestrian and Safety Improvements

Timeline: 2024 - 2027
  • Road
  • Pre-construction
  • King County
State Route 900/Martin Luther King Jr. Way South in the unincorporated Skyway-West Hill community is a busy roadway between Renton and Seattle serving drivers, freight, public transit, bicyclists and pedestrians. This project will construct bicycle and pedestrian facilities on SR 900 that allow…
Project

SR 900/68th Ave S Vicinity – Pedestrian Safety – Phase 2 PCCP & Deck Overlay – Completed May 2023

Timeline: August 2022 - May 2023
  • Road
  • Completed
  • King County
In the Bryn Mawr-Skyway area of King County between Seattle and Renton, just west of 68th Avenue South, we worked with King County Metro to build 500 feet of new sidewalk and a raised platform for pedestrians to access a Metro bus stop on the east side of the highway.

This new…
Project

SR 99 to Eastbound SR 518 On-ramp - Emergency Culvert Repair - Complete October 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Part of a culvert running underneath the State Route 99 on-ramp to eastbound SR 518 in Tukwila failed, damaging the on-ramp as well as the shoulder along the Airport Expressway on-ramp to eastbound SR 518.

Contractor crews repaired failed section of the culvert to prevent further…
Project

SR 99 tunnel - Complete February 2019

Timeline: 2009 - 2019
  • Road
  • Completed
  • King County
The SR 99 tunnel replaced the Alaskan Way Viaduct along Seattle's central waterfront, carrying State Route 99 beneath downtown Seattle. The 2-mile tunnel opened to drivers in February 2019.
Project

SR 99/1st Ave S Bridge-Tower Mitigation & Watertight Door Replacement

Timeline: Summer 2025 - Summer 2026
  • Road
  • Pre-construction
  • King County
This project will replace watertight doors, demolish the East Control Tower’s top two floors and seal the new roof on the northbound State Route 99 1st Avenue South Bridge from mileposts 26.83 to 26.88. This project will also include waterproof membrane roof work on the West Bridge Control Tower…
Project

SR 99/S 272nd St to SR 516 Vic - Paving & ADA Compliance project

Timeline: 2024-2027
  • Road
  • Pre-construction
  • King County
This project will resurface the northbound and southbound lanes of State Route 99 from South 272nd Street to SR 516 to extend the pavement service life. Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping and traffic control. Pedestrian…
Project

SR 99/Spokane Street Bridge - Expansion Joint Modification

Timeline: Fall 2025 - Summer 2026
  • Road
  • Pre-construction
  • King County
Contractors working on behalf of WSDOT will replace 13 expansion joints on the State Route 99 Spokane Street Bridge and rehabilitate the bridge’s drainage system. This work will help preserve the service life of the bridge.
Project

SR 99/Tunnel – Pavement Texturing

Timeline: Spring 2025 – Fall 2025
  • Road
  • Pre-construction
  • King County
Crews working for WSDOT will texture the existing concrete pavement of the north and southbound State Route 99 tunnel. The technique of shot-blasting the roadway will provide added friction for vehicles’ tires and improve traction.

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.