Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
160 results
2023 Stormwater Conveyance System Mapping
Publication date:
Submittal due:
Notice - This ad is currently closed.
Washington State Department of Transportation (WSDOT) solicits interest from consultants interested in submitting a Statement of Qualifications (SOQ) to assist WSDOT with stormwater conveyance system mapping Statewide. One (1) agreement may be…
Washington State Department of Transportation (WSDOT) solicits interest from consultants interested in submitting a Statement of Qualifications (SOQ) to assist WSDOT with stormwater conveyance system mapping Statewide. One (1) agreement may be…
SR 539, Duffner Ditch Fish Passage
Publication date:
Contract number: 009935
Submittal due:
Installing a box culvert, grading, stream alignment, storm sewer realignment, existing culvert slip lining, hot mix asphalt paving, pavement marking, guardrail, erosion control, planting, cable vault, fiber optic cable, fiber testing, traffic control and other work. Involves 86 items and 47 Working…
SR 7, Unnamed Tribs to S Creek Remove Fish Barriers & Paving
Publication date:
Contract number: 009928
Submittal due:
Remove and replace existing culverts with new fish passable structures, earthwork, structure installation, pavement repair, paving, pavement marking, replacing detection loops, temporary detour, channel realignment, streambed restoration, temporary erosion and sediment control, drainage, and…
SR 3, SR 16 and SR 166, Gorst Vicinity - Remove Fish Barriers
Publication date:
Contract number: 009920
Submittal due:
The existing water crossing structures at this location have been identified as fish passage barriers. By replacing the existing structures with fish passable structures, the restriction to fish passages will be eliminated.
SR 509, 24th Avenue South to South 188th Street – New Expressway
Publication date:
Contract number: 009905
Submittal due:
WSDOT will build the remaining two miles of new SR 509 Expressway, reconfigure SR 509 interchanges at South 188th and South 160th Streets and add a southbound auxiliary lane on I-5 between SR 516 and South 272nd Street.
SR 3, SR 104, SR 303 and SR 307, Kitsap County Remove Fish Barriers
Publication date:
Contract number: 9874
Submittal due:
The Washington State Department of Transportation (WSDOT) plans to replace 29 existing fish barriers within Kitsap County with fish passable structures utilizing a progressive design-build delivery method. This project will replace 29 existing fish barrier crossings on SR 3, SR 104, SR 303, SR3 07…
SR 167 Corridor Improvements Project
Publication date:
Contract number: 009866
Submittal due:
The SR 167 Corridor Improvements Project will upgrade the toll system on SR 167 by updating the functionality to mirror the toll system on the I-405 express toll lanes (ETLs), which includes photo tolling, destination pricing, implementing double white line buffers in select areas and other general…
SR 20 Spur, Anacortes Trm - Tollbooth Replacement
Publication date:
Contract number: To be assigned
This contract provides for the preservation of the tollbooths at Anacortes Ferry Terminal, in Skagit County. This work consists of demolition and replacement of the existing tollbooths, installation of a steel canopy, upgraded signing to meet Americans with Disabilities Act (ADA) requirements and…
SR 20, Emergency Pavement Repair
Publication date:
Contract number: 009854
Submittal due:
Planing bituminous pavement, paving with hot mix asphalt, erosion and water pollution control, traffic control and other work. Involves 13 items and 15 working days. Work Class 4.
US 101/SR 116 North Olympic Peninsula - Remove Fish Barriers
Publication date:
Contract number: 009847
Submittal due:
This project will remove existing barriers to fish migration at the following US 101 & SR 116 stream crossings and replace with fish-passable structures in compliance with the federal injunction regarding fish passage underneath WSDOT highways Tumwater Creek (US 101 MP 246.4), Ennis Creek (US…
SR 520, I-5 to Montlake - I/C and Bridge Replacement
Publication date:
Contract number: 009775
Submittal due:
This project will replace the existing Portage Bay Bridge 520/3, with two new parallel variable depth segmental box girder bridges across Portage Bay, the existing SR 520 eastbound off-ramp structure to Montlake Boulevard East, the existing 10th Ave E and Delmar E under-crossings with a new…
SR 20, Olson Creek and Unnamed Tributary to Skagit River – Fish Passage
Publication date:
Contract number: 009764
Submittal due:
This project will replace the existing fish barrier culvert crossings on SR 20 at Unnamed Tributary to Skagit River (milepost 94.82, Washington Department of Fish and Wildlife Site 991126) and SR 20 at Olson Creek (milepost 105.42, Washington Department of Fish and Wildlife Site CD18) with fish…
I-405, Brickyard to SR 527 Improvement Project
Publication date:
Contract number: 009727
Submittal due:
The proposed I-405, Brickyard to SR 527 Improvement Project will create a dual express toll lane (ETL) system from south of the I-405/SR 522 interchange to the I-405/SR 527 interchange. This project includes new lanes, direct access ramps, interchange improvements, Stride bus rapid transit stations…
I-5, Mounts Rd to Steilacoom-DuPont Rd – Corridor Improvements
Publication date:
Contract number: 009743
Submittal due:
The project provides for the improvement of I-5, from milepost 116.55 to 120.94, Pierce County. I-5 will be widened to accommodate four thru-lanes in each direction. Auxiliary lanes will be added to both directions of I-5 between the Center Drive and Steilacoom-DuPont Road interchanges. The left…
I-90, SR 161, SR 202 & SR 203 – Fish Passage
Publication date:
Contract number: 009750
Submittal due:
This project is to remove nine existing fish barriers and replace them with fish-passable crossings at I-90 Sunset Creek, SR 161 Unnamed Tributaries to Hylebos Creek and SR 202/SR 203 Tributaries to Snoqualmie River. The project shall include, but is not limited to, the following:
Design…
Design…
I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Publication date:
Contract number: 009732
Submittal due:
The proposed I-405, Northeast 85th Street Interchange and Inline Station Project (Project) is located within the City of Kirkland along Interstate 405 (I-405) between milepost (MP) 17.4 to MP 18.9. The Project proposes to replace the existing two-level cloverleaf interchange at NE 85th Street with…
SR 544, Unnamed Tributary to Fourmile Creek Fish Passage
Publication date:
Contract number: 009738
Submittal due:
Earthwork, culvert removal and installation, hot mix asphalt (HMA) paving, pavement marking, guardrail, roadside restoration, temporary erosion control, traffic control and other work. Forty working days. Involves seventy-five items.
SR 108 & US 101, Mason and Thurston Co Fish Barriers - Remove Fish Barriers
Publication date:
Contract number: 9714
Submittal due:
This project will remove existing barriers to fish migration at the following US 101 stream crossings and replace with fish-passable structures in compliance with the federal injunction regarding fish passage underneath WSDOT highways:
Mason County (SR 108)
Unnamed Tributary…
Mason County (SR 108)
Unnamed Tributary…
I-5, E Fork Lewis River Bridge NB - Replace Bridge
Publication date:
Contract number: 9634
Submittal due:
Remove and replace the aging East Fork Lewis River Bridge located on northbound Interstate 5, at milepost 18.21 - approximately 3 miles south of Woodland, in Clark County.
US 101, Jefferson & Clallam County - Remove Fish Barriers
Publication date:
Contract number: 009694
Submittal due:
This project will remove existing barriers to fish migration several US 101 stream crossings and replace with fish-passable structures in compliance with the federal injunction regarding fish passage underneath WSDOT highways. Other elements include, but are not limited to, constructing embankments…
SR 167, I-5 to SR 509 - New Expressway
Publication date:
Contract number: 9540
Submittal due:
This project proposes to construct a new approximately 2-mile SR 509 Spur alignment between SR 509 and I-5 supported on embankment, including interchanges at I-5, 54th Avenue East, and SR 509.
I-405, NE 132nd Street Interchange Project
Publication date:
Contract number: 9573
Submittal due:
This project proposes to construct a new half diamond interchange at NE 132nd Street, new fish passable culverts along the I-405 corridor, and improve local roadway access within project limits.
I-5, NB Marine View Drive to SR 529 - Corridor & Interchange Improvements Project
Publication date:
Contract number: 009551
Submittal due:
This project will improve the I-5/SR 529 interchange by adding a new NB off-ramp to SR 529 and a new on-ramp to SB I-5 from SB SR 529. The project will improve NB I-5 travel by adding a new permanent fourth lane for high occupancy vehicles.
US 101 & SR 109, Grays Harbor/Jefferson/Clallam - Remove Fish Barriers Project
Publication date:
Contract number: 009567
Submittal due:
The project will replace approximately 29 existing fish barriers along US101 and SR 109 with fish passable structures in Grays Harbor, Jefferson, and Clallam Counties. This project will be delivered in two phases utilizing the PDB delivery method. The Phase 1 will include preliminary engineering to…
I-90, SR 18 I/C to Deep Creek - Interchange Improvements & Widening Project
Publication date:
Contract number: 009572
Submittal due:
The project will construct a four-lane Diverging Diamond Interchange (DDI) at the I-90 and SR 18 interchange in combination with the widening of SR 18 to four lanes to improve traffic operations and safety and reduce congestion at the I-90 and SR 18 interchange and along the SR 18 mainline.
US 395, NSC Spokane River to Columbia - Shared Use Path
Publication date:
Contract number: 009552
Submittal due:
The project will construct a multi-use path between north of Carlisle Avenue and the Columbia Avenue trailhead in Hillyard.
The project will also construct pedestrian bridges over Euclid Avenue, mainline NSC and BNSF railroad (at Garland Avenue), and Wellesley Avenue. This will…
The project will also construct pedestrian bridges over Euclid Avenue, mainline NSC and BNSF railroad (at Garland Avenue), and Wellesley Avenue. This will…
I-5 & SR 11, Padden Creek - Fish Passage
Publication date:
Contract number: 009493
Submittal due:
This project will replace the existing fish barrier culvert crossings on I-5 at Padden Creek (MP 250.45 to MP 250.65, WDFW Site 994233) and SR 11 at Padden Creek (MP 20.95 to MP 21.25, WDFW Site 994386) with fish passable water crossing structures.
SR 3, Chico Creek and Tributary - Remove Fish Barriers Project
Publication date:
Contract number: 009475
Submittal due:
The purpose of this project is to replace existing fish barrier crossings for Chico Creek and an Unnamed Tributary to Chico Creek with fish passable structures. The barriers are located at SR 3 MP 40.96, SR 3 southbound off-ramp to Chico Way, SR 3 southbound on-ramp, and an SR 3 maintenance access…
SR 509, SR 509 Completion - Stage 1B
Publication date:
Contract number: 9424
Submittal due:
The SR 509 Stage 1b is the first major stage of the SR 509 Completion Project, located in King County in the cities of Des Moines, Kent and SeaTac. WSDOT plans to complete construction of the SR 509 Completion Project in two major stages by 2028.
When completed, the project will…
When completed, the project will…
US 12, Nine Mile Hill to Frenchtown Vic - Build New Highway
Publication date:
Contract number: 009406
Submittal due:
The project will reconstruct US 12 as a Limited Access Full Control four lane divided highway to reduce crash risk and improve economic vitality.
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.