Search contracting opportunities

Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.

Filter contracts

Select
Select
Select
Select

160 results

SR 99, Tunnel Pavement Texturing

Publication date:
Contract number: XE3633
Submittal due:
  • Public Works
  • Advertised
  • King County
Requires texturing the existing concrete pavement, including temporary erosion and sediment control, temporary traffic control and other work. Involves 16 items and 23 working days. Work class 21.

US 195, SR 27 to Babbit Rd Paving

Publication date:
Contract number: XE3632
Submittal due:
  • Public Works
  • Advertised
  • Whitman County
Requires shoulder finishing, pavement repair excavation, crack sealing, planing bituminous pavement, pavement repair, hot mix asphalt paving, inlet protection, erosion control, seeding and mulching, medium compost, guardrail, pavement markings, centerline and shoulder rumble strips, signing,…

SR 512 and SR 410, Puyallup and Sumner Vicinity Paving

Publication date:
Contract number: XE3634
Submittal due:
  • Public Works
  • Advertised
  • Pierce County
Milling and filling with hot mix asphalt (HMA), pavement repair and markings, traffic control and other work. 41 working days. Involves 31 items. Work class 4.

I-90, WB SR 900 to E Sunset Way Paving & Expansion Joints

Publication date:
Contract number: XE3627
Submittal due:
  • Public Works
  • Advertised
  • King County
Hot mix asphalt paving and planing, pavement and bridge deck repair, applying waterproof membrane, replacing expansion joints and traffic loops, pavement marking, temporary erosion control, traffic control and other work. Involves 65 items and 85 working days. Work class 4.

US 395, Chewelah to Immel Rd Paving

Publication date:
Contract number: XE3629
Submittal due:
  • Public Works
  • Advertised
  • Stevens County
Requires planing bituminous pavement, hot mix asphalt (HMA) paving, pavement repair, installing concrete curb, guardrail, guide posts and blocks, crack sealing, HMA joint sealing, shoulder finishing, pavement markings, centerline rumble strips, signing and traffic control and other work. 25 working…

SR 432, Washington Way - Signal Replacement

Publication date:
Contract number: XE3628
Submittal due:
  • Public Works
  • Advertised
  • Cowlitz County
Requires a new traffic signal, illumination, intelligent transportation systems (ITS), traffic islands, ADA curb ramp, APS pushbuttons, paving, pavement markings, permanent signing, traffic control and other work. 45 working days. Involves 44 items. Work class 9.

US 101, Skookum Creek Br to N of Jct SR 8 Paving

Publication date:
Contract number: XE3630
Submittal due:
  • Public Works
  • Advertised
  • Mason County
  • Thurston County
Requires planing bituminous pavement, pavement repair, removal of overlay from bridge deck, bridge deck repair, waterproof membrane, tack coat, inlay with hot mix asphalt (HMA), installing pavement markings installing new signs, maintaining traffic control and other work. Involves 43 items and 57…

Graveyard Spit Dynamic Revetment and Dune Restoration

Publication date:
Contract number: XE3623
Submittal due:
  • Public Works
  • Advertised
  • Pacific County
Requires stabilizing and mitigating erosion of the roadway embankment by constructing a dynamic revetment adjacent to the highway to protect it from wave action, traffic control and other work. Involves 46 items 172 working days. Work class 1.

SB 100th St SE Vic to Broadway Ave Paving

Publication date:
Contract number: XE3620
Submittal due:
  • Public Works
  • Advertised
  • Snohomish County
Requires planing bituminous pavement, paving with hot mix asphalt (HMA), pavement repair, replacing traffic loops, pavement marking, temporary erosion control, traffic control and other work. Involves 47 items and 60 working days. Work class 4 - asphalt paving.

NB Spokane St Ramp Meter Installation

Publication date:
Contract number: XE3619
Submittal due:
  • Public Works
  • Advertised
  • King County
Requires furnishing and installing ramp meter system, including Non-Intrusive Vehicle Detector for Ramp Metering, ITS, electrical, signing, temporary erosion and water pollution control, traffic control and other work. Involves 17 items and 29 working days. Work class 41 - intelligent…

Kitsap Vicinity - Paving

Publication date:
Contract number: XE3618
Submittal due:
  • Public Works
  • Advertised
  • Kitsap County
  • Pierce County
Requires rehabilitating the existing roadway by planing bituminous pavement, excavating pavement repair areas, paving with hot mix asphalt, bridge deck repair and placing waterproof membrane for bridges, replacing existing pavement markings, traffic control and other work. Involves 47 items and 50…

Eagle Harbor Maintenance Facility Welding Shop Building Replacement

Publication date:
Contract number: XE3625
Submittal due:
  • Ferries
  • Public Works
  • Advertised
  • Kitsap County
Requires constructing a new welding shop, paving, potable water, sanitary sewer, electrical upgrades and other work. Involves 53 items and 235 working days. Work class 7 - building construction.

N of Moclips Highway - Stabilize Slope

Publication date:
Contract number: XE3626
Submittal due:
  • Public Works
  • Advertised
  • Grays Harbor County
Requires repairing an existing hillside due to landslide activity. clearing and grubbing, excavation, installing quarry spalls and ditch liner, constructing horizontal drains, restoration planting, traffic control and other work. Involves 42 items and 55 working days. Work class 1 - clearing,…

Maytown Rd to Plum St - Paving

Publication date:
Contract number: XE3624
Submittal due:
  • Public Works
  • Advertised
  • Thurston County
Requires milling and filling with HMA, installing a new catch basin, pavement repair, pavement markings, removal of illumination poles and short capping work, traffic control and other work. Involves 48 items and 45 working days. Work class 4 - asphalt paving.

US 395, Hafer Rd to Chewelah - Paving

Publication date:
Contract number: XE3622
Submittal due:
  • Public Works
  • Advertised
  • Stevens County
Requires roadway excavation, embankment compaction, drainage modifications, crack sealing, bridge joint sealing, planing bituminous pavement, hot mix asphalt (HMA) paving, joint adhesive, erosion control, seeding and mulching, compost, curb and gutter, sidewalk, guardrail, pavement markings, rumble…

I-90, EB WLS Parkway to E Sunset Way - Paving

Publication date:
Contract number: XE3621
Submittal due:
  • Public Works
  • Advertised
  • King County
Requires hot mix asphalt (HMA) paving and planning, pavement repair, replacing traffic loops, pavement marking, temporary erosion and sediment control, temporary traffic control and other work. 52 working days. Involves 37 items. Work class 4 - asphalt paving.

I-90, Harvard Rd Interchange Ramp Meters

Publication date:
Contract number: XE3617
Submittal due:
  • Public Works
  • Advertised
  • Spokane County
Planing bituminous pavement, installing maintenance access pads, hot mix asphalt (HMA) paving, guardrail, pavement markings, permanent signing, illumination, traffic signal and ITS systems, directional boring, traffic control and other work. 40 working days. Involves 28 items. Work class 9 & 16…

US 2, West of Leavenworth - Slope Stabilization

Publication date:
Contract number: XE3616
Submittal due:
  • Public Works
  • Advertised
  • Chelan County
  • King County
Requires rock slope scaling, pavement and guardrail repair, slope protection, traffic control and other work. Involves 31 items and 36 working days. Work class 39.

Systemwide On-Call Off-Shore Maintenance

Publication date:
Contract number: XE3615
Submittal due:
  • Ferries
  • Public Works
  • Advertised
  • Jefferson County
  • Island County
  • King County
  • Kitsap County
  • San Juan County
  • Skagit County
  • Snohomish County
  • Pierce County
Requires improvement of damaged wingwalls and dolphin structures, counterweight cables, anchor chain, anchors, piles, and live load hanger bar replacement at Washington State Ferry Terminals in various Counties on an on-call basis, and other work. The duration of this Contract is from the date of…

I-90, E of Vantage to Moses Lake - Paving

Publication date:
Contract number: XE3613
Submittal due:
  • Public Works
  • Advertised
  • Grant County
Requires pavement repair excavation incl. haul, crack sealing, planning bituminous pavement, hot mix asphalt, permanent signing, traffic control and other work. Involves 52 bid items and 120 working days. Work class 4.

US 395, Lind Coulee Bridge to I-90 SB Lanes Only Paving

Publication date:
Contract number: XE3612
Submittal due:
  • Public Works
  • Advertised
  • Adams County
Requires planing bituminous pavement, crack sealing, hot mix asphalt paving, repairing guardrail, guide posts, rumble strips, pavement markings, traffic control and other work. Involves 53 bid items and 50 working days. Work class 4.

SR 21 and SR 260, 2025 Eastern Region Chip Seal

Publication date:
Contract number: XE3609
Submittal due:
  • Public Works
  • Awarded
  • Adams County
  • Franklin County
Requires bituminous surface treatment, pavement repair excavation, crack sealing, hot mix asphalt (HMA) for pavement repair and prelevel, joint seal at bridge ends, shoulder finishing, guideposts, pavement markings, erosion control, traffic control and other work. Involves 36 items and 36 working…

US 2, Coles Corner Vicinity - Paving

Publication date:
Contract number: XE3610
Submittal due:
  • Public Works
  • Pending Award
  • Chelan County
Requires shoulder finishing, pavement repair, bridge deck repair, crack sealing, planing bituminous pavement, removing existing asphalt overlay, hot mix asphalt (HMA), erosion control and water pollution control, pavement markings, traffic control and other work. Involves 51 items and 55 working…

I-5, Gravelly-Thorne Connector Shared Use Path

Publication date:
Contract number: XE3611
Submittal due:
  • Public Works
  • Advertised
  • Pierce County
Requires grading, asphalt paving, stormwater facilities, retaining walls, a new pedestrian bridge, signing, illumination, signal improvements, traffic control, roadside restoration and other work. Involves 174 items and 370 workings days. Work class 6 or 20.

Notice of bid opportunity - Intercity Bus Dungeness Line

Publication date:
Submittal due:
  • Consultant Services
  • Advertised
  • Statewide
The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract for WSDOT to provide intercity bus transportation…

US 12, Howell Grade Rd to Garfield-Asotin Co. Line-Paving

Publication date:
Contract number: XE3608
Submittal due:
  • Public Works
  • Advertised
  • Garfield County
Full depth reclamation, paving with hot mix asphalt (HMA), installing guardrail, replacing striping and rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. 35 working days. Involves 37 items. work CL 1 or 4.

SR 18, EB C St SW Vic to Green River Paving & Joint Replacement

Publication date:
Contract number: XE3605
Submittal due:
  • Public Works
  • Awarded
  • King County
Grinding and inlaying hot mix asphalt (HMA), updating traffic loops, pavement markings, joint work on Bridge 18/9, temporary erosion control, traffic control and other work. 65 working days. Involves 52 items. Work class 4.

US 2 et al, NCR Guardrail Updates 2025

Publication date:
Contract number: XE3606
Submittal due:
  • Public Works
  • Cancelled
  • Chelan County
  • King County
  • Kittitas County
Removing asphalt concrete pavement, removing guardrail, quarry spalls, reinforced concrete culvert pipe, crushed surfacing base course, commercial hot mix asphalt, cement concrete, traffic curb and gutter, beam guardrail components, precast concrete barrier, project temporary traffic control and…

Notice of bid opportunity - Transportation Equipment Fund (TEF) Tank Monitoring

Publication date:
Submittal due:
  • Consultant Services
  • Closed
  • Statewide
Notice - This ad is currently closed.

The Washington State Department of Transportation (“WSDOT”) is issuing this Competitive Solicitation pursuant to RCW 39.26. Pursuant to this Competitive Solicitation, WSDOT intends to conduct a competitive procurement to award an Agency Contract…

SR 518, Tukwila International Boulevard Station (TIBS) Bus Rapid Transit Project

Publication date:
Contract number: XE3492
Submittal due:
  • Public Works
  • Planned
  • King County
The SR 518, Tukwila International Boulevard Station (TIBS) Bus Rapid Transit (Project) will create a new Bus Rapid Transit (BRT) station on SR 518 between mileposts 2.49 and 2.91, to connect the existing Tukwila International Boulevard Link light rail station and communities to the south of SR 518…

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.