385 results

Project

SR 9 - 176th Street SE to SR 96 - Widening

Timeline: 2025 - 2027
  • Road
  • Pre-construction
  • Snohomish County
To address increased congestion, WSDOT has widened SR 9 from two lanes to four from its southern starting point to Marsh Road, except for a 3-mile section in the middle—from 176th Street Southeast to SR 96—where there is only one northbound lane and two southbound lanes. This project will add a…
Project

SR 9 - SR 204 Intersection Improvements - Completed July 2025

Timeline: July 2016 - July 2025
  • Road
  • Completed
  • Snohomish County
WSDOT improved the intersection of SR 9 and SR 204 in Lake Stevens by adding four roundabouts and widening SR 9 to two lanes in each direction immediately south of the intersection. These improvements help manage congestion and improve mobility, provide better access to area businesses and provide…
Project

SR 9 - Unnamed Tributary to Pilchuck Creek - Fish Passage - Complete Summer 2022

Timeline: Fall 2019 - Summer 2022
  • Road
  • Completed
  • Skagit County
  • Snohomish County
A culvert that runs under State Route 9 at milepost 34.7, south of Lake McMurray near the North Centennial Trail Trailhead, was failing and needed to be replaced. The bottom of the culvert had rusted away, which resulted in water washing away the side of the road. This caused a sinkhole on the…
Project

SR 9 – Lake Creek and Norway Park Creek – Fish Passage - Complete October 2022

Timeline: July 2022 - October 2022
  • Road
  • Completed
  • Skagit County
Beginning in July 2022, contractor crews working for WSDOT removed two fish barriers under State Route 9 near Lake McMurray in Skagit County at Lake Creek and Norway Park Creek, replacing them with two new fish passable structures.
Project

SR 9 – Marsh Road to 2nd Street Vicinity – Widening & Bridge Painting

Timeline: 2018 - 2028
  • Road
  • Construction
  • Snohomish County
This project will widen State Route 9 between Marsh Road and 2nd Street near the city of Snohomish, build two southbound bridges directly to the west of the existing bridges—which will become northbound lanes—over the Snohomish River, and rebuild the on-ramp from 2nd Street to southbound SR 9. It…
Project

SR 9/Bickford Ave. Intersection Improvements - Complete May 2023

Timeline: May 2022 - Spring 2023
  • Road
  • Completed
  • Snohomish County
In June 2022, Granite Construction Company, contractor crews working for WSDOT, built a roundabout at the intersection of State Route 9 and Bickford Avenue.
Project

SR 9/South Lake Stevens Road – Intersection Improvements - Complete May 2023

Timeline: February 2022 - Spring 2023
  • Road
  • Completed
  • Snohomish County
Beginning in February 2022, Interwest Construction Inc., contractor crews working for WSDOT, constructed a roundabout at the intersection of SR 9 and South Lake Stevens Road to improve safety and mobility. Crews also improved fish habitat by replacing the existing culvert under South Lake Stevens…
Project

SR 900 - Tibbetts Creek to Lake Sammamish – fish passage

Timeline: 2020-2029
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals. Beginning as early as winter 2024, WSDOT will install…
Project

SR 900/57th Ave S to S 135th Pedestrian and Safety Improvements

Timeline: 2024 - 2027
  • Road
  • Pre-construction
  • King County
State Route 900/Martin Luther King Jr. Way South in the unincorporated Skyway-West Hill community is a busy roadway between Renton and Seattle serving drivers, freight, public transit, bicyclists and pedestrians. This project will construct bicycle and pedestrian facilities on SR 900 that allow…
Project

SR 900/68th Ave S Vicinity – Pedestrian Safety – Phase 2 PCCP & Deck Overlay – Completed May 2023

Timeline: August 2022 - May 2023
  • Road
  • Completed
  • King County
In the Bryn Mawr-Skyway area of King County between Seattle and Renton, just west of 68th Avenue South, we worked with King County Metro to build 500 feet of new sidewalk and a raised platform for pedestrians to access a Metro bus stop on the east side of the highway.

This new…
Project

SR 92/Lundeen Creek to Lake Stevens Fish Passage

Timeline: 2022 - November 2026
  • Road
  • Pre-construction
  • Snohomish County
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project

SR 92/Pilchuck River CED – Woody Debris Repair - Complete November 2025

Timeline: July 2024 - November 2025
  • Road
  • Completed
  • Snohomish County
Beginning in July 2024, contractor crews working for WSDOT re-establishd fish habitat in the Pilchuck River along State Route 92, just south of Sleepy Hollow Road, near Granite Falls. This project replaced large woody debris constructed as fish habitat in 2016, much of which had washed away. This…
Project

SR 96 - North Creek Fish Passage - Complete Winter 2024

Timeline: Summer 2023 to Winter 2024
  • Road
  • Completed
  • Snohomish County
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project

SR 99 to Eastbound SR 518 On-ramp - Emergency Culvert Repair - Complete October 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Part of a culvert running underneath the State Route 99 on-ramp to eastbound SR 518 in Tukwila failed, damaging the on-ramp as well as the shoulder along the Airport Expressway on-ramp to eastbound SR 518.

Contractor crews repaired failed section of the culvert to prevent further…
Project

SR 99 tunnel - Complete February 2019

Timeline: 2009 - 2019
  • Road
  • Completed
  • King County
The SR 99 tunnel replaced the Alaskan Way Viaduct along Seattle's central waterfront, carrying State Route 99 beneath downtown Seattle. The 2-mile tunnel opened to drivers in February 2019.
Project

SR 99/1st Ave S Bridge-Tower Mitigation & Watertight Door Replacement

Timeline: Summer 2025 - Summer 2026
  • Road
  • Pre-construction
  • King County
This project will replace watertight doors, demolish the East Control Tower’s top two floors and seal the new roof on the northbound State Route 99 1st Avenue South Bridge from mileposts 26.83 to 26.88. This project will also include waterproof membrane roof work on the West Bridge Control Tower…
Project

SR 99/S 272nd St to SR 516 Vic - Paving & ADA Compliance project

Timeline: 2024-2027
  • Road
  • Pre-construction
  • King County
This project will resurface the northbound and southbound lanes of State Route 99 from South 272nd Street to SR 516 to extend the pavement service life. Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping and traffic control. Pedestrian…
Project

SR 99/Spokane Street Bridge - Expansion Joint Modification

Timeline: Fall 2025 - Fall 2026
  • Road
  • Pre-construction
  • King County
Contractors working on behalf of WSDOT will replace 13 expansion joints on the State Route 99 Spokane Street Bridge and rehabilitate the bridge’s drainage system. This work will help preserve the service life of the bridge.
Project

SR 99/Tunnel – Pavement Texturing - Complete August 2025

Timeline: Summer 2025
  • Road
  • Completed
  • King County
Crews working for WSDOT textured the existing concrete pavement of the north and southbound State Route 99 tunnel. The technique of shot-blasting the roadway provided added friction for vehicles’ tires and improved traction.
Project

SR3 / SR104 / SR303 / SR307 / SR308 Kitsap County Remove Fish Barriers Project

Timeline: 2027 - 2030
  • Road
  • Pre-construction
  • Kitsap County
This project will remove barriers to fish under several state highways in Kitsap County. Work is planned in 29 locations on state routes 3, 104, 303, 307 and 308.

Once complete, this project will restore approximately 93 miles of potential habitat across the Kitsap Peninsula.
Project

SR99/SR 516 to S 200th St – Paving & ADA Compliance

Timeline: Winter 2025 – Fall 2025
  • Road
  • Construction
  • King County
This project has rehabilitated nearly two miles of State Route 99 from the SR 516 intersection in Des Moines/Kent to South 200th Street in SeaTac. Crews ground away existing asphalt and installed a fresh layer of hot mix asphalt, giving the roadway a smoother surface and extending its lifespan.…
Project

Tacoma Narrows Bridge Toll Equipment Replacement Project

Timeline: Spring 2024 - Summer 2025
  • Road
  • Construction
  • Pierce County
The eastbound span of the Tacoma Narrows Bridge opened July 15, 2007 as the first modern toll road in Washington.

What at the time was considered state of the art technology is nearing the end of its usable life. Over the course of several months WSDOT will replace the aging and…
Project

Ticketing and Reservations Modernization

Timeline: 2025 - 2027
  • Ferry
  • King County
We’re updating our ticketing and reservation systems to improve the customer experience when buying tickets and booking vehicle reservations. The types of tickets we offer and how vehicle reservations work aren’t changing. However, the tools for buying tickets and booking reservations will be…
Project

US 101 - 0.8 Miles N of Astoria-Megler Br. - Emergency Culvert Replacement - Complete Spring 2021

Timeline: February 2021 - Spring 2021
  • Road
  • Completed
  • Pacific County
On February 16, 2021, due to heavy seasonal rainstorms and harsh winter weather, the existing culvert drainage system that runs underneath a portion of US 101 at milepost 1.2, just north of the Astoria-Megler Bridge, began to fail causing a portion of the road to give way and sink.

Project

US 101 - Coffee Creek - Remove Fish Barrier - Complete November 2020

Timeline: August 2019 - November 2020
  • Road
  • Mason County
Crews working for WSDOT built a replicated stream between Coffee Creek and Goldsborough Creek in Shelton. The project also rebuilt both southbound on- and off-ramps at the US 101/West Shelton/Matlock interchange.
Project

US 101 - Elwha River Bridge - Bridge Replacement

Timeline: April 2023 - December 2025
  • Road
  • Construction
  • Clallam County
WSDOT replaced the US 101 Elwha River Bridge in Port Angeles. Replacing the bridge has ensured that US 101 continues to be a reliable transportation facility for decades to come.

The new bridge is 40 feet wide and has two 12-foot lanes with two-8 foot shoulders. (The old bridge was…
Project

US 101 - Indian Creek - Remove Fish Barrier - Completed March 2023

Timeline: February 2022 - March 2023
  • Road
  • Completed
  • Clallam County
This project removed and replaced an outdated culvert under US 101 west of Port Angeles at Indian Creek. To keep traffic moving, crews constructed a temporary bypass bridge near the site as the new bridge over Indian Creek was built.

The culvert was replaced with a new 180-foot…
Project

US 101 - Jefferson and Clallam Counties Fish Barriers - Remove Fish Barriers

Timeline: Summer 2023 - Fall 2025
  • Road
  • Construction
  • Clallam County
  • Jefferson County
This project addresses multiple barriers to fish under US 101 between Sequim and Discovery Bay.
Project

US 101 - Leland Creek and Unnamed Tribs - Remove Fish Barriers - Complete December 2023

Timeline: February 2023 - December 2023
  • Road
  • Completed
  • Jefferson County
This project removes and replaces several outdated barriers to fish migration under US 101 near Leland Valley Road NE in Jefferson County. The north and south tributaries at mileposts 290.3 and 291.8 will be replaced with larger box culverts, and the site crossing Leland Creek will be replaced with…
Project

US 101 - May Creek in Vic of Dowans Creek Rd - Remove Fish Barrier

Timeline: Spring 2024 - Fall 2026
  • Rail
  • Construction
  • Jefferson County
  • Clallam County
This fish barrier removal project replaces an outdated culvert under US 101 south of Forks. A 175-foot-long concrete girder bridge will replace the existing metal pipe to improve fish migration in May Creek.

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.