Search projects
Learn about current transportation network improvement and preservation activities throughout the state.
You might be looking for studies or local agency managed projects
366 results
Project
US 195 - Old BNRR Bridge to Jct. SR 271 - PCCP - Complete June 2023
Timeline: May 2022 - Spring 2023
This project is located on US 195 in Whitman County between milepost 52 near the Cashup Flatts Weigh Station and milepost 62, just south of the SR 271 interchange. Cracked and damaged concrete panels will be replaced along this stretch of roadway. The roadway will also be diamond ground to remove…
Project
US 195 - SR 270 to Babbit Road – Paving
Timeline: July 2025 - August 2025
This project will rehabilitate roughly 14 lane miles of US 195 from State Route 270 to Babbit Road in Whitman County. The project includes removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project
US 195 – Babbit Road to Colfax Paving - Complete August 2023
Timeline: July 2023 - September 2023
This project will rehabilitate approximately 8.5 miles of US 195 from Babbit Road to Colfax in Whitman County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved for years to come.
Project
US 195 – Colfax North Fork Palouse River – Replace Bridges
Timeline: Summer 2029 - Summer 2031
The Washington State Department of Transportation (WSDOT) is in the early design phase of replacing the two bridges that cross the North Fork of the Palouse River, with a new single bridge structure, as they have reached the end of their expected service life.
Project
US 195 – Cornwall Road to Cheney-Spokane Road – NB Lanes Only – Paving
Timeline: August 2024 - Summer 2025
This project will rehabilitate roughly 11 miles of northbound US 195 from Cornwall Road to Cheney-Spokane Road in Spokane County. This project will grind and inlay new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved for years to come.
Project
US 2 - South Shore Road to Newport – Paving
Timeline: July 2025 - September 2025
This project will repave roughly four miles of US 2 between South Shore Road and the City of Newport in Pend Oreille County. The project includes Hot Mix Asphalt (HMA) grinding, paving, pavement repair, crack sealing, and joint adhesive. This project will rehabilitate the existing mainline pavement…
Project
US 2 - US 97 Easy St Roundabout - Complete July 2023
Timeline: Present - Summer 2023
This project will improve mobility and reduce collision severity at the intersection of US 2/97 and Easy Street in Wenatchee, by constructing a multi-lane roundabout at the existing signalized intersection. Other improvements including transit pull outs and extension of the Apple Capital Loop…
Project
US 2 and SR 21 - Wilbur – Paving & Complete Streets
Timeline: Spring 2025 - Fall 2027
This project will rehabilitate State Route 21 and US 2 within Wilbur. Aspects of Complete Streets will be applied to the project which includes updates for active transportation.
Project
US 2 Grotto Vicinity Slope Stabilization - Complete December 2023
Timeline: October 2023 - December 2023
In fall 2023, we built two debris flow fences on the north side of US 2 near milepost 44, or approximately four miles northwest of Skykomish. These fences will help mitigate risk to two culvert inlets, reducing the chances a potential debris flow from the Bolt Creek burn scar could clog them and…
Project
US 2 Trestle Capacity Improvements & Westbound Trestle Replacement
Timeline: August 2023 - August 2026
The US 2 trestle in Snohomish County is the only direct highway route across the Snohomish River to Interstate 5 (I-5). The US 2 Trestle Capacity Improvements & Westbound Trestle Replacement project begins with a Planning and Environmental Linkages (PEL) study. Federal PEL studies allow us to…
Project
US 2 West of Leavenworth Slope Stabilization
Timeline: July 2025-October 2025
The project will increase safety for the public on the US 2 corridor by addressing four slopes with a history of active rockfall. The project will reduce the risk of rockfall by repairing damaged slope stabilization systems at three rock slopes and by scaling loose rock at the remaining rock slope…
Project
US 2 – Colbert Rd Intersection Revision - Complete October 2023
Timeline: June 2023 - October 2023
This project improves the safety at the US 2 and Colbert Road intersection in North Spokane County by installing J-Turns. WSDOT was able to secure funding to improve safety by adding J-Turns also known as RCUT's (Restricted Crossing U-Turn Intersection) to reduce the number of conflict points…
Project
US 2 – Creston to Rocklyn - Paving - Complete June 2023
Timeline: Spring 2023 - Summer 2023
This project will rehabilitate roughly 15 miles of US 2 from the town of Creston to approximately five miles west of Davenport at Rocklyn Road in Lincoln County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will…
Project
US 2 – Spokane County Line to SR 211 Paving - Complete December 2024
Timeline: August 2024 - October 2024
This project will rehabilitate roughly 26 lane miles of US 2 from the Spokane County line to State Route 211 in Pend Oreille County. This project will grind and inlay new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved for years to come.
Project
US 2 – Sunset Interchange - Illumination Replacement - Complete November 2023
Timeline: July 2023 - September 2023
This project will replace the luminaires on US 2 at the Sunset Highway interchange in Spokane County. The aging illumination system will be replaced with modern components including LED light fixtures which will save on maintenance and energy costs for years to come. Illumination systems will be…
Project
US 2/Corridor Safety Improvements
Timeline: Late 2025 – Late 2026
This project will improve pedestrian and traffic safety on US 2 at 11 locations by replacing the signalized intersection in Sultan at US 2 and Old Owen Road/Fern Bluff Road with a roundabout and installing delineation, signing, truck aprons, curb ramps, curbing and crosswalks along the US 2…
Project
US 2/Sexton Creek to Pilchuck River Fish Passage
Timeline: Spring 2025 - Fall 2025
This project will remove a fish passage barrier on US 2 at Sexton Creek just south of Three Lakes Road near Snohomish. Contractor crews working for WSDOT will remove the two existing 5-foot steel culverts that run for over 180 feet under US 2 and replace them with a fish-passable structure. This…
Project
US 395 - Chewelah to Immel Road – Paving
Timeline: July 2025 - August 2025
This project will rehabilitate roughly five miles of US 395 from just north of SR 231 through Chewelah in Stevens County. The project includes removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project
US 395 - Hafer to Chewelah – Paving
Timeline: July 2025 - October 2025
This project will rehabilitate roughly five miles of US 395 from just north of SR 231 through Chewelah in Stevens County. The project includes removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project
US 395 - Lind Coulee Bridge to I-90 Southbound Lanes Only – Paving
Timeline: July 2025 - October 2025
This project will rehabilitate roughly 15 miles of southbound US 395 from approximately the town of Lind at Lind Coulee Bridge to approximately the town of Ritzville at the I-90/US 395 interchange in Adams County. The interchanges, both northbound and southbound, at SR 21, Paha-Packard Road, and I-…
Project
US 395 - NSC Spokane River to Columbia - New Segment - Completed August 2024
Timeline: April 2021 - August 2024
This project will further expand the North Spokane Corridor south from its current end location at Columbia Avenue to the Spokane River. This includes the construction of a new interchange at Wellesley Avenue.
Project
US 395 - NSC Spokane River to Columbia - Shared Use Path - Complete March 2025
Timeline: May 2021 - Spring 2025
This project extended the current Children of the Sun Trail from where it ends at Columbia Avenue south to Carlisle Avenue. This project was a design-build with the contractor as Graham Contracting.
Project
US 395 - NSC Sprague to Spokane River - Phase 1 - Completed November 2023
Timeline: July 2021 - November 2023
Contractor crews will be constructing the raised freeway of the North Spokane Corridor between Mission Avenue and Ermina Avenue over Spokane Community College's parking lot. This project consists of two bridge structures, one for northbound future US 395 traffic and one for southbound future…
Project
US 395 Pioneer Memorial Bridge – Bridge Painting Stage 2 - Complete December 2024
Timeline: December 2023 - January 2025
The US 395 Pioneer Memorial Bridge, also known as the Blue Bridge, needed a new coat of paint to preserve and maintain structural integrity. The paint on the Blue Bridge was faded, weathered, and damaged and this allows corrosion to occur. Crews removed the old peeling paint, cleaned and painted…
Project
US 395 – Division Wye to Wandermere – Paving – Complete Streets
Timeline: Spring 2023 - Summer 2027
US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required…
Project
US 395 – Hafer Road to Chewelah – Paving & Complete Streets
Timeline: Spring 2023 - Summer 2025
This project will rehabilitate US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, from roughly milepost 202.87 to 207.94 in Stevens County. Crews will be removing the top layer of asphalt and placing new hot mix asphalt (HMA) to create a smoother ride and preserve the roadway…
Project
US 395 – Hatch Road to Hamilton Road – Paving
Timeline: September 2024 - June 2025
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project
US 395 – Loon Lake to Hafer Road – Paving & Roundabout - Complete June 2023
Timeline: August 2022 - June 2023
This project will grind and inlay a little more than 12 miles of roadway on US 395 in Stevens County between the intersection with SR 292 in Loon Lake north to Hafer Road. Crews will be grinding out the pavement and replacing the roadway surface with Hot Mix Asphalt (HMA) to create a smoother ride…
Project
US 395 – NSC I-90 Connection
Timeline: June 2027 - Early 2030's
This is the final four projects to construct the North Spokane Corridor and connect to I-90. This is the last step to create the limited access 10.5 mile freeway north/south through Spokane that will remove freight and trips off of the local system.
Project
US 395 – NSC Spokane River Crossing
Timeline: May 2023 - 2025
This project will construct the North Spokane Corridor bridge that will cross the Spokane River and connect the skyway portion near Spokane Community College to the south and at Carslie Avenue to the north of the river.
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.