Project

Revive I-5 - Ship Canal Bridge preservation

Timeline: 2020 - 2027
  • Road
  • Construction
  • King County
WSDOT built Interstate 5, Washington’s main freeway, in the 1960s. The busiest section runs through Seattle with almost 240,000 vehicles traveling across the I-5 Ship Canal Bridge daily. This critical highway now requires major preservation and repairs.

Working with our contractor,…
Project

Revive I-5: Preserving a vital freeway

Timeline: Now into 2030s
  • Road
  • King County
Dozens of preservation projects are planned to revive Interstate 5 in King and Snohomish counties. Washington’s main freeway was built in the 1960s and needs major preservation and renovation work. Over the coming years, Revive I-5 projects will include pavement repair and full replacement,…
Project

SE Burley-Olalla Rd to Sidney Rd Paving - Complete October 2023

Timeline: July 2023 - October 2023
  • Road
  • Completed
  • Kitsap County
Workers repaired the surface of westbound SR 16. Repairs were also made to three bridge expansion joints.
Project

South Access - Surface Street Connections Project - Complete

Timeline: July 2021 - April 2024
  • Road
  • Completed
  • King County
This project completed final roadway work around the south portal of the SR 99 tunnel and built new pedestrian and bicycle amenities that connect Seattle’s stadiums with the waterfront.
Project

Southworth Terminal Preservation

Timeline: Pre-construction 2025 – 2027
  • Ferry
  • Pre-construction
  • Kitsap County
The Southworth Terminal Preservation project will replace the aging terminal to maintain safe and reliable service for those who travel between the Kitsap Peninsula, Vashon Island, West Seattle, and beyond. This terminal is an essential piece of Washington State Ferries’ (WSF) Triangle route and…
Project

SR 104 - Hood Canal Bridge - Center Lock Rehabilitation

Timeline: May 2021 - Fall 2025
  • Road
  • Construction
  • Kitsap County
  • Jefferson County
Crews will upgrade and replace key elements of the SR 104 Hood Canal Bridge. The construction bolsters systems that guide the bridge together and keep both halves of the bridge connected.
Project

SR 104 - Lyon Creek Fish Passage

Timeline: Spring 2025 - Spring 2026
  • Road
  • Construction
  • King County
This project will remove a fish passage barrier on State Route 104 at Lyon Creek just west of 35th Avenue Northeast in Lake Forest Park. Contractor crews working for WSDOT will replace an existing 6-foot-by-4-foot box culvert with a new 24-foot-wide structure. This new structure has the potential…
Project

SR 104 - Paradise Bay - Shine Road & SR 19 - Intersection Safety Improvements

Timeline: May 2024 - Spring 2026
  • Road
  • Construction
  • Jefferson County
This project improves safety along State Route 104 in Jefferson County at Shine Road/Paradise Bay Road and at State Route 19. At SR 19, a single-lane roundabout has been built. At Shine Road/Paradise Bay Road, a single-lane metered roundabout will be built. The meter will be active only after a…
Project

SR 104 - SR 19 - Intersection Safety Improvements

Timeline: Late Spring 2024 - Early Winter 2024
  • Road
  • Not started
  • Jefferson County
To improve safety and reduce head-on collisions, crews will construct a single-lane roundabout at State Route 104 and SR 19 (Beaver Valley Road).

Roundabouts are a proven solution to reduce the frequency and severity of collisions while maintaining a consistent flow of traffic.…
Project

SR 104 Kingston Ferry Terminal Traffic Improvement

Timeline: Timeline to be determined
  • Ferry
  • Road
  • Pre-construction
  • Kitsap County
This project would relocate travelers heading to and from the Kingston Ferry Terminal to Northeast First Street.
Project

SR 105 – Graveyard Spit Project - Dynamic Revetment and Dune Restoration

Timeline: March 2025 - March 2026
  • Road
  • Construction
  • Pacific County
Starting in summer 2025, crews will work to protect Graveyard Spit, a shoreline along SR 105 between the Shoalwater Bay Reservation (milepost 19.5) and Panoramic Lane (milepost 20.10). The project will shield the community from coastal erosion, climate change, and rising sea levels while preserving…
Project

SR 106/Twanoh Creek - Remove Fish Barrier - Complete September 2023

Timeline: June 2023 - September 2023
  • Road
  • Completed
  • Mason County
WSDOT removed a barrier to fish under SR 106 at Twanoh State Park. WSDOT removed the existing culvert and replaced it with a box culvert.

Project

SR 108 - US 101/Mason and Thurston Co Fish Barriers - Remove Fish Barriers - Complete December 2024

Timeline: Summer 2023 - Fall 2024
  • Road
  • Completed
  • Mason County
  • Grays Harbor County
This project removed multiple barriers to fish under two state highways. Crews worked on SR 108 near Kamilche and US 101 near the Thurston/Mason County line.
Project

SR 109 Hoquiam to Ocean City – Remove Fish Barriers - Complete December 2024

Timeline: Spring 2024 - Fall 2024
  • Road
  • Completed
  • Grays Harbor County
This project replaced culverts under SR 109 in Grays Harbor County.
Project

SR 109 Ocean City to Taholah – Remove Fish Barriers

Timeline: Fall 2025 - Fall 2027
  • Road
  • Pre-construction
  • Grays Harbor County
This project will remove five barriers to fish under SR 109 on the Quinault Indian Nation.
Project

SR 109 – South of Taholah – Realignment

Timeline: Spring 2032 - Spring 2035
  • Road
  • Pre-construction
  • Grays Harbor County
Crews will build approximately 1.7 miles of new SR 109 between Point Haynisisoos (Point Grenville) and the Quinault Indian Nation Village of Taholah. The project will relocate the existing highway away from coastal erosion. The proposed new highway will have two lanes with wide shoulders.
Project

SR 109/Grass Creek Bridge – Emergency Repair - Completed January 2023

Timeline: Winter 2022 - Late Winter 2023
  • Road
  • Completed
  • Grays Harbor County
This project involved repairs to the Grass Creek Bridge on State Route 109 west of Hoquiam. Work at this site included installing two steel piles and a steel cross beam at three of the bridge pier locations to support the bridge and restore its weight capacity.
Project

SR 109/N of Moclips Highway - Stabilize Slope - Complete October 2025

Timeline: July 2025 - October 2025
  • Road
  • Completed
  • Grays Harbor County
This project made repairs to the hillside next to State Route 109 north of Moclips on the Quinault Indian Nation.
Project

SR 109/W of Hoquiam - Stabilize Slope - Complete March 2023

Timeline: Early spring 2023
  • Road
  • Completed
  • Grays Harbor County
Crews worked to stabilize the hillside above SR 109 west of Hoquiam.
Project

SR 112 E of Sail River to E of E Twin River – Paving Preservation & Emergency

Timeline: Summer 2025 - Fall 2026
  • Road
  • Construction
  • Clallam County
This project will pave 7 miles for State Route 112 starting at milepost 0. Ten drainage culverts will be replaced from milepost 0 to milepost 8. Signage replacements between milepost 0 and milepost 41. This project also includes embankment repair work between mileposts 2 and 5.6.
Project

SR 112/Clallam Bay - Emergency Repairs - Complete July 2022

Timeline: Nov. 2021 - July 2022
  • Road
  • Completed
  • Clallam County
Crews reopened State Route 112 near Clallam Bay to two-way travel at 6 p.m. Monday, March 21. The highway closed on Monday, Nov. 15, 2021 due to massive landslide and regionwide flooding. The detour using Eagle Crest Way has been removed.

Crews worked to remove additional slide…
Project

SR 112/Jim Creek West - Emergency Repairs - Complete June 2022

Timeline: Nov. 2021 - Summer 2022
  • Road
  • Completed
  • Clallam County
Construction to reopen State Route 112 at milepost 32 began Monday, March 28, 2022 after the highway dropped almost 4-feet. Work at Jim Creek includes: slope stabilization efforts, roadway repairs, installation of new guardrail, installation of new trench and horizontal drains, replacement of three…
Project

SR 112/W Rasmussen Creek and Hoko River – Emergency Project - Complete September 2022

Timeline: Summer - Fall 2022
  • Road
  • Completed
  • Clallam County
This emergency project took place at two sites on SR 112 in Seiku: at milepost 4.6 near Rasmussen Creek and at milepost 11.4 on the Hoko River.

At Rasmussen creek, construction crews rebuilt and replaced two areas of the embankment, which slid into the Strait of Juan de Fuca. Work…
Project

SR 113/S of Old Sappho-Pysht Hwy – Stabilize Slope - Completed August 2022

Timeline: Nov. 2021 - August 2022
  • Road
  • Completed
  • Clallam County
This project will repair an unstable slope and replace a clogged culvert under Burnt Mountain Road (SR 113) near Beaver in Clallam County. A new culvert and stabilized hillside will allow water to flow properly through the area without the use of a temporary water pump, preventing additional…
Project

SR 127 Elmer C. Huntly Snake River Bridge – Deck Rehabilitation - Complete July 2023

Timeline: February 2023 - July 2023
  • Road
  • Completed
  • Garfield County
  • Whitman County
The bridge deck on the Elmer C. Huntly Bridge across the Snake River on State Route 127 near Lower Granite Dam, was showing signs of deterioration due to normal wear and tear. This project repaired and resurfaced the existing bridge deck to maintain the structural integrity to continue safe…
Project

SR 127 – Central Ferry to Big Alkali Road - Paving - Complete October 2023

Timeline: July 2023 - September 2023
  • Road
  • Completed
  • Whitman County
This project will rehabilitate approximately 9.5 miles of SR 127 from Central Ferry to Big Alkali Road in Whitman County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be preserved for years to come.
Project

SR 129 Highland Ave to US 12 and SR 129 Spur – ADA Compliance: Complete Streets

Timeline: Project Postponed
  • Road
  • Asotin County
This project evaluates upgrades under the Americans with Disabilities Act (ADA) and Complete Streets initiatives to create a more accessible, comfortable, economical, sustainable, and efficient transportation system along SR 129. However, due to limited preservation funding and the need for…
Project

SR 14 - 0.7 to 0.2 Miles W. of Chamberlain Lake Rest Area - Unstable Slope - Complete April 2023

Timeline: Nov. 2021 - Summer 2023
  • Road
  • Completed
  • Klickitat County
Several sections of the slope on the north side of the roadway above SR 14, between milepost 73.16 and 73.92, had a history of rockfall, especially in fall and winter months. To reduce the risk of rockfall and mitigate slope stability, contractor crews from Strider Construction Co., Inc., worked to…
Project

SR 14 - 1.7 Miles East of Bingen - Slope Stabilization - Complete June 2022

Timeline: April 2021 - Summer 2022
  • Road
  • Completed
  • Klickitat County
Several sections along State Route 14 had a history of recurring rockfall activity above the roadway. To help reduce future potential rockfall activity and improve safety for travelers, in summer 2021, our contractor, James Dean Construction, Inc., began work to stabilize the slope located on the…
Project

SR 14 - E of Bingen – Port of Klickitat Access Improvements

Timeline: Spring 2015 - Fall 2026
  • Rail
  • Road
  • Construction
  • Klickitat County
This project will improve safety and connectivity between Bingen Point, the Port of Klickitat and State Route 14 in Klickitat County. Currently, travelers and emergency responders must use a railroad crossing on Steuben Street (SR 14) to access the port and Bingen Point. Passing trains often block…

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.